pro-lifting_v2Pro-liftingpro-lifting_v2pro-lifting_v2
  • Home
  • Services
  • Tools & Equipments
  • Projects
    • Micron Singapore
    • Tanjung Jati Indonesia
    • Muara Laboh Indonesia
    • Lontar Indonesia
    • Labuan Malaysia
    • BLNG Brunei
    • Melbourne Australia
  • Testimonial
  • About Us
  • Contact us
Stator Removal & Installation Project- BLNG (Brunei)
February 28, 2020
100MW Geothermal Power Plant Project at Muara Laboh, Indonesia
August 19, 2019

Tanjung Jati B Expansion 2 x 1000MW Coal Fired Power Plant

Lifting of scafflolding at Jepara site. Total of 48nos of 15tons strand jacks being used.
6af5cc42-73e7-4d30-b9ff-8951b44ff107
0064f815-1fd6-4a11-ac94-a4d3c3a96674
a62855d5-2727-41e5-9034-c6a3c36bcbcc
e8c4c8af-ad04-4465-b90f-8443028a5350
e3244bbc-e254-485c-8efc-0c51b109ecc7
 
Share
0

About Us

Pro-Lifting Solution provide solution & a range equipment to cater to your heavy lifting needs, ranging from strand jack to gantry system

Projects

  • Lontar, Indonesia 
  • Tanjung Jati, Indonesia
  • Muara Laboh, Indonesia
  • BLNG, Brunei 
  • Labuan, Malaysia
  • Central Melbourne, Australia
  • Micron, Singapore

 

 

Contact Us

Office:
7 Soon Lee Street, #04-05 iSPACE, Singapore 627608

Phone:
+65 96328807

Email:
enquiry@pro-lifting.com.sg

© 2019 Pro-Lifting Solution. All Rights Reserved.