pro-lifting_v2Pro-liftingpro-lifting_v2pro-lifting_v2
  • Home
  • Services
  • Tools & Equipments
  • Projects
    • GlobalFoundries Singapore
    • Micron Singapore
    • Tanjung Jati Indonesia
    • Muara Laboh Indonesia
    • Lontar Indonesia
    • Labuan Malaysia
    • BLNG Brunei
    • Melbourne Australia
  • Testimonial
  • About Us
  • Contact us
Tanjung Jati B Expansion 2 x 1000MW Coal Fired Power Plant
August 19, 2019
2 x 750MW Lontar Coal Fired Power Plant Project
August 19, 2019

100MW Geothermal Power Plant Project at Muara Laboh, Indonesia

This project was awarded to us by our client in Indonesia for lifting and skidding of 100ton generator at Muara Laboh, Indonesia. Total 4nos of Strand Jacks and 2nos of pulling jacks being used. We successfully completed the work within 6 hours.

83ee66dd-7fab-483d-bc1c-27e8959d20b4
950dc2de-4067-477a-9937-7da30b773f8d
900282d9-c48e-4956-a18e-5dedcef8c8df
a073bd35-d258-4968-b654-a42d520ce7a3
Share
0

About Us

Pro-Lifting Solution provide solution & a range equipment to cater to your heavy lifting needs, ranging from strand jack to gantry system

   

Projects

  • Lontar, Indonesia 
  • Tanjung Jati, Indonesia
  • Muara Laboh, Indonesia
  • BLNG, Brunei 
  • Labuan, Malaysia
  • Central Melbourne, Australia
  • Micron, Singapore
  • GlobalFoundries, Singapore

 

 

Contact Us

Office:
7 Soon Lee Street, #04-05 iSPACE, Singapore 627608

Phone:
+65 96328807

Email:
enquiry@pro-lifting.com.sg

© 2019 Pro-Lifting Solution. All Rights Reserved.