Our Services

Engineering Studies
Provide customized heavy lifting solutions and services
Consultancy services
Provide lifting equipment and personnel
Project Management

Our Tools & Equipments

Our Strand Jack

We have a range of strand jacks from 15tons to 185tons. Our strand jacks are capable to be used in single or multiple groups to cater to the required capacity. Lifting can synchronize manually or with the use of our advanced system. Each strand jack is tested in our workshop and validated by DNVGL or Lloyd’s before deployment to project sites.

Our DL-P40 computer control system

The DL-P40 computer control systems are written and developed in-house by DLT using in-house software and hardware engineers working in consultation with operators. It can be used to control of up to 40 No. Jacks from a single control computer.

Our Gantry System

We provide the lifting solution for generators and turbine in the power plant. We deploy the hydraulic gantry from J&R Lift-N-Lock system. This solution provides greater mobility and better efficiency than over head cranes and mobile cranes.

Our Customer Says

 

We are impressed with the professionalism of Pro-Lifting Solution Pte Ltd team to put together for this project that included engineering studies, project management and lifting (on-base) of the 320 tons generator. We highly recommend their expertise, knowledge and capabilities to our client future project.

Linayati
PT Superkrane Mitra Utama Tbk.

We Appreciated for the dedication and exceptional team work of Pro-Lifting Solutions Pte Ltd for involving in the lifting of Generator in Muara Laboh Geothermal Power Plant. We looking forward to work with them again for the future project.

Nanang Irwanto
PT. Jurong Engineering Lestari

We appreciate the excellent equipment rental service provided from Pro-Lifting Solution. The Strand Jack System were used to support the build of two of the biggest tunnel boring Machines (TBM). We will look forward for the future requirement in this project.

Colin Feldtmann
CPB Contrators

We would like to take this opportunity to thank you for the services and cooperation during the period of the project (Removal and Re-installation of STATOR Project- BLNG)

Muhammed Hasif
JEL (Borneo)